[1] ACCE BHAGWATI AWARD 2008
       OUTSTANDING DESIGN FOR INDUSTRIAL PLANT / STRUCTURE
 
       DETAILS REQUIRED (IN DUPLICATE)
 
  1)  Name of the Project and its location:
  2)  Name of the designers / specialists (other than nominee if any) with address,telephone number etc.,
  3)  Was it individual or joint effort?
  4)  Design criteria, and measures adopted to achieve the same.
  5)  Give concept and design approach. Write the process of design from concept to finalisation.
  6)  Is project of National importance ?
  7)  Were alternatives considered to achieve economy ?
  8)  How do you evaluate the design as outstanding?
  9)  Significant environment impact, any recycling of wastes and their utilisation.
10)  Products manufactured/processed in the plant/casting yard/at site, (give details).
11)  Casting / fabricating and erection techniques/methodology designed/adopted.
12)  Details of any special machines, plants, process designed/used for construction and erection.
13)  Details of foundation design with of special significance and interest, if any.
14) List of drawings enclosed (Submit important drawings only).
15)  Is the project implemented  (Give dates of start and finish.)
16)  Give photographs during and after construction highlighting specific details.
17)  Give references.


Date   Name & Signature of Applicant
Place  



Above nomination is recommended for ACCE AWARDS 2008 - by Member
Name  
Address  
Membership No  
  Signature of the Member of ACCE(I)